Key Projects

PROJECTS


10MW BIOMASS BOILERHOUSE
Retrofit project including project management services and piping system installation and insulation, including heat exchangers, circulation and network pumps for 10MW biomass fired boiler house in Latvia.
FLUE GAS TREATMENT SYSTEM
District Heating biomass fired boiler house retrofit project in Latvia with mechanical and electrical installation performed by JT Unimetal team, as well as insulation works and cladding for the flue gas treatment system including ESP, Flue Gas Condenser, Multi-Cyclones, Flue Gas Fans and Flue Gas Ducts.
News and Recent Projects

4MW WASTE WOOD BOILER HOUSE
Turn-key installation of the 4MW watertube boiler and supporting equipment in Sweden. Installation included fuel handling system, ash removal system, watertube combustion and heat exchanger, soot blowing system, pressurised air supply system, flue gas cleaning equipment (ESP, MC), blowers and flue gas fan, piping, ducts and control system.

500M3 UNDERGROUND FUEL STORAGE
Supply and turn-key installation of the walking floor, fuel crushers, fuel mixing unit, hydraulic power system and hydraulic roof for the 500m3 capacity underground solid fuel storage for waste wood fired heating plant in Sweden.

CONTACT SUPPORT
How Can We Help?