top of page

4MW system delivery

We have delivered to site in Finland main technological equipment for the 4MW biomass fired boiler plant. The delivered scope included moving grate frame system, supporting frame, hydraulic fuel feeder and shutter, heat exchanger etc.

©2020 by JT Unimetal.

  • Facebook
  • LinkedIn
bottom of page